New Dwelling House at Grange View
The New Dwelling House at Grange View was awarded the Alan King Award for Excellence in Architectural Technology at CIAT’s AT Awards in 2019. |
Contents |
[edit] Outline
The client’s brief was to create a contemporary, low-energy, accessible dwelling within a former walled garden, to nestle into the existing streetscape. Due to the limited mobility of the client, the dwelling had to be designed to allow for full accessibility without being obvious, as the site is surrounded on three sides with mature trees and a public road to the fourth – the use and deflection of light was paramount.
The site required to have two primary elevations with the formal public elevation designed to reflect the Victorian gabled frontage of the surrounding properties, using modern materials to put a subtle twist on the design. The ground floor has been designed to form a free-flowing family space, allowing each area to retain its own identity but remove access barriers which would be an issue to the client’s mobility. The southerly garden-facing elevations were designed to allow for maximum solar gains deflecting into other areas of the dwelling and forming features inside with a fully vaulted entrance hallway.
Surrounded with historic lime trees among 30-plus protected trees on site, particular care had to be taken to protect and preserve these at design stage ensuring they were not compromised now and in the future – this gave the benefit of the dwelling being set into an already mature setting. The property was designed with a limited frame structure, which allowed for continual bulk deliveries, as the site is located on a busy thoroughfare.
Disruption was kept to a minimum with planned deliveries and installations carried out at specific times. The site is adjacent to an anterior route as it is located within a former walled garden along with 30-plus TPO trees. This meant that material delivery and movement were restricted and had to be managed carefully, along with the main contractor, to ensure that storage areas were maintained, as well as site access routes controlled and safely managed.
Pre-planning at design stage was carried out to reduce impacts on public traffic flows. Deliveries were timetabled to non-peak times, as well as sub-soil removals being carried out at the same time as a large-scale services road closure. This allowed controlled removal to an adjoining site for landscaping works, ensuring the impact on landfill was reduced.
The overall structure was carefully planned with a main steel frame to the central core interacting with a timber structure infill to allow reduced and simplified movement on site. The building was specifically designed for our clients who have progressive mobility issues: we created large, flowing open-plan areas divided by specifically-located partitions or doors which are DDA compliant. The structure around the feature stair was formed to be able to support any future chairlifts and the first floor pre-trimmed for a possible future lift.
The large ‘living hub’ area, sub divided by lowered feature ceiling area, ensures that the mechanical ventilation with heat recovery (MVHR) system is not compromised and controls airflow and optimum ventilation without structured barriers. The central ‘hub’ was designed as the central living space with positioning and balancing expanses of glazing to the area at high level with overhanging sections to lower levels. This ensured that maximum light was afforded along with controlling solar gains; also, the addition of a contemporary multi-fuel stove within the ‘snug’ section, with careful positioning of thermostats, allowed the control of the heating system with primary and secondary demands. The large vaulted nature of the structure at this point with the MVHR ensured that all heat was carefully re-distributed and controlled.
The master bedroom located directly off the ‘hub’ area benefits from a feature vaulted ceiling and direct access to the garden terrace. To ensure energy use was reduced to a minimum for now and the future, the dwelling was over insulated by 25%.
The overall sustainability and lifetime worth of all elements were fittingly considered through the design process. Each material was scored to ensure its benefits outweighed any negatives in relation to a number of factors. This included embodied energy, production values and transport, with the overall aim to construct and finish the property with long-term durable materials. The property was designed and post tested with an airtightness level of four, which was pre-consulted to reach optimum performance, as well as suit the client’s living style. This was formed with high performance variable vapour barriers and specific taping, with challenging junctions designed out to simplify site taping.
The addition of a PV solar array to the southerly-facing roof designed to supplement main demand, and large rooflights and expanses of specifically-positioned glazing to sheltered areas, means that the demand on artificial lighting is significantly reduced.
[edit] Judges’ comments
This new dwelling is an excellently laid-out scheme with exact brief design and the aspiration of lifetime home standards — it is flexible enough for anyone to use it. There is a fine attention to detail and thoroughly thought through to address the user’s needs now and in the future. Within the design, the maximum use of solar gain has been utilised without overheating. This is a showcase for demonstrating how technology has supported the design, making it an outstanding winner for the Alan King Award.
[edit] About this article
This article was written by Stuart Davidson Architecture for CIAT’s AT Journal (No 131, Autumn 2019). It can be accessed HERE.
Other articles by the CIAT on Designing Buildings Wiki can be accessed HERE.
[edit] Related articles on Designing Buildings Wiki
- A Home to Remember.
- Accessibility in the built environment.
- Access audit.
- Access consultant.
- Access and inclusion in the built environment: policy and guidance.
- Accessible London.
- Anthropometrics in architectural design.
- Approved document M.
- Balance for Better: Why lack of diversity is an issue for everyone.
- Built Environment Professional Education BEPE.
- Changing lifestyles.
- Equality Act.
- Equal opportunities policy.
- Essential principles, Creating an accessible and inclusive environment.
- Evacuating vulnerable and dependent people from buildings in an emergency FB 52.
- Guide Dogs' Inclusivity campaign.
- Inclusive design.
- Lifetime homes.
- Lifetime neighbourhoods.
- Older people.
- National Planning Policy Framework.
- Planning permission.
- Ramps.
- Special educational needs: an analysis of the necessities for inclusion
- Stairlift.
--CIAT
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.